Selective demolition · Toronto & the GTA
Remove What Changes.Protect What Stays.
Selective demolition for commercial interiors—removing defined walls, ceilings, flooring, fixtures and selected components while protecting the areas that remain.
Plans, marked-up drawings, photos or a simple scope description are enough to start.
Remove · marked openingRemain · finished glazingProtect · active routeWSIB CoveredWorkplace Compliance
Safety-trained crewsWAH, WHMIS and site documentation
Flexible SchedulingDays, Nights & Weekends
Toronto & the GTACommercial project support
What comes out—and what stays
The limit is part of the work.
Selective demolition is not a smaller strip-out. It is a different control problem: remove the specified component while keeping the surrounding construction usable.

One unit · one controlled scope
Define the removal limit.
Orange identifies the approved scope. Retained walls, glazing, columns and operating areas stay visible around it.
Scroll to separate the marked scope
The scope is not complete just because the right material came out.The right material also has to stay.

One-day work in active spaces
Open tomorrow. Protected today.
In an active office, restaurant or store, nearby contents can be covered or temporarily moved so the defined demolition can proceed. After removal and cleanup, items moved for access can be returned to their original location when requested.
- CoverProtect nearby furniture, finishes and operating areas.
- MoveTemporarily relocate contents where access requires it.
- Return & cleanClear the work area and return moved items when requested.
Scheduled around the site: day, night and weekend work is available across Toronto and the GTA.
Typical selective scopes
One item, one room or several marked areas.
The useful question is not how much can be removed. It is what condition the next trade needs at the approved limit.
Walls & partitions
Complete or partial interior removals set by drawings, dimensions or field marks.
- Drywall
- Metal studs
- Doors and frames
- Layout openings
Ceilings
Remove only what the next phase requires while retaining the defined ceiling assembly.
- Ceiling tile
- Selected T-bar grid
- Bulkheads
- Local access openings
Flooring
Follow marked limits instead of stripping the floor wall to wall.
- Carpet and carpet tile
- Vinyl and laminate
- Tile finishes
- Adhesive where included
Millwork & fixtures
Remove selected built-ins and finishes without extending into retained areas.
- Cabinetry
- Counters
- Shelving
- Washroom accessories
Concrete & defined openings
Localized removal only where the approved documents establish a suitable non-structural scope.
- Marked slab areas
- Local openings
- Specified dimensions
- Approved project limits
Measure · mark · confirm · remove
A visible route through the work.
Each step protects the agreed limit and prepares a clear condition for the next decision.
Swipe to review all five steps
- 01
Review
Use drawings, mark-ups, photos or a written scope to identify the intended work.
DeliverableInitial scope outline - 02
Confirm
Identify what remains, verify dimensions and raise unclear conditions before removal.
DeliverableConfirmed boundaries - 03
Mark
Make limits, termination points and protected components visible in the work area.
DeliverableField-marked work zone - 04
Remove
Sequence the work around access, retained construction and the following trades.
DeliverableControlled removal - 05
Hand off
Remove generated debris and leave the area clean for the next project phase.
DeliverableDefined next-trade condition
Built for the people responsible for the space
Small scope does not mean low importance.
ROXA reviews defined scopes for commercial project teams and active businesses—from one partition to several isolated demolition areas.
General contractors
Drawing limits and trade sequencing
Project managers
Schedule, coordination and issue control
Property managers
Building access and retained-area protection
Facility managers
Active-space continuity and cleanup
Owners
Scope clarity and controlled change
Commercial tenants
Contained work around an operating space
Selective demolition FAQs
Before you send the scope.
Practical answers for defining removal limits, scheduling and active-space controls.
Explore related interior demolitionWhat is selective demolition?
Selective demolition removes designated parts of an existing commercial interior while surrounding components remain in place. It is commonly used for renovations, alterations and tenant-improvement work.
Can ROXA remove only part of a wall or floor?
Yes. Partial wall, flooring, ceiling and finish removals can follow dimensions, drawings or field markings. The limit is reviewed before work begins so the removal does not extend into the next area by assumption.
Can ceiling tiles be removed while the grid stays?
Yes, when the approved scope calls for the suspended ceiling grid to remain and site conditions allow it. The retained grid and nearby services are identified before tile removal.
Can selective demolition happen in an active office, restaurant or store?
Yes, when the work can be properly contained and coordinated. Nearby contents may be covered or temporarily moved, dust controls and protected routes can be established, and items moved for access can be returned to their original location when requested after demolition and cleanup.
Do you handle small selective demolition scopes?
Yes. A scope may be one partition, a defined flooring area or several isolated items. Labour-only help can also be scheduled in advance when a project needs additional hands.
Can the work be scheduled after hours or on weekends?
Yes. Day, night and weekend work can be scheduled around building access, noise restrictions, site rules and the agreed project sequence.
What happens when site conditions do not match the drawings?
If an unexpected condition affects the demolition limit or an item that must remain, work stops at the relevant boundary. The condition is identified so the project team can confirm the next step before the area is opened further.
What if hazardous or structural materials are involved?
Hazardous-material requirements must be addressed before affected materials are disturbed. Structural components require appropriate project documents, engineering and approvals. Neither condition is assumed to be part of an ordinary selective interior demolition scope.
Drawings, mark-ups, photos or a written scope
Show us the limit.We will review the next step.
Send what should be removed, what must remain and any site or schedule requirements.